Chronicle leadthrough of restoration works

07.07.2009 - 15.09.2009
The Cathedral of the Nativity of the Virgin (1490) in the Ferapontov monastery

The Federal State Budgetary Research Institution “State Research and Development Institute of Restoration” (director – A. Trezvov) made the conservation of Dionisy’s frescoes in the lower tiers of the western portal of the cathedral.

25.05.2009 - 15.10.2009
Monks’ cells (XVIIth cent.)

The roof and the brickwork of walls were restored. The walls were cleaned off plaster and whitewash and covered with the protective lime plaster. The facades were whitewashed.

The anti-damage works were made by LLC “Electra” (Director – K. Smirnov)

04.05.2009 - 25.12.2009
The Church of the Virgin’s Robe Deposition (1485) from the village Borodava

The church was disassembled. They restored the foundation of the church, the log construction, the floor and the ceiling.

The repair and restoration works were made by Limited Liability Company “Restoration center – architecture, manufacture, training” (general manager – A. Popov).

26.03.2009 - 25.12.2009
Guard cells near the Kazanskaja tower (1658-1659)

The repair and restoration works were finished. The works were made by LLC “Electra” (Director – K. Smirnov).

16.06.2008 - 25.09.2008
The Assumption Cathedral (1497) of the Kirillo-Belozersky monastery

The Federal State Unitary Enterprise “Interregional Science, Restoration and Art Department” (director – S. Filatov) restored the painting of the XVIIth century in the dome drum of the cathedral.

16.06.2008 - 25.09.2008
The Cathedral of the Nativity of the Virgin (1490) in the Ferapontov monastery

The Federal State Budgetary Research Institution “State Research and Development Institute of Restoration” (director – A. Trezvov) made the conservation of the western external wall with ceramic plinth and of the painting of the western portal of the cathedral.